ProductData Center / Facility

GW Ranch data-center campus

Data-center campus on more than 8,000 acres in Pecos County, Texas, permitted for on-site natural-gas generation.

Coverage

Aug 12, 2026
AIAnalysis
A New Bottleneck for AI Power: A 2031 Gas-Turbine Slot

As data-center developers add on-site generation to bridge utility delays, the grid queue is being joined by queues for turbines, air permits, gas infrastructure, storage, and EPC capacity.

Aug 12, 2026 · By SCN Staff · 12 min read